97久久精品人妻人人搡人人玩,无码Gv永久免费网站,任你躁在线精品免费,亚洲成a人片在线播放观看国产,五月天婷婷色,亚洲视频第二区,北岛玲日韩精品一区二区三区,国产成人精品高清在线
            Home NewsNews CenterSuccessful Power Generation of 11.94 MW Distributed Photovoltaic Power Generation Project Phase I
            Successful Power Generation of 11.94 MW Distributed Photovoltaic Power Generation Project Phase I
            ?Released on:23 January 2025
            source:China MCC5 Group
            release time:2025年06月06日
            view:1523

            Recently, Yizheng Mingneng (Phase I) 11.94 MW distributed photovoltaic power generation project constructed by MCC5 was successfully connected to the grid at full capacity.

            The project is located on the roof of the plant of Jiangsu Tongzhou Warehouse Co., Ltd. in Yizheng City, Jiangsu Province, with a total installed capacity of 11.94 MW, a total area of about 75,000 square metres, and a total of 20,411 photovoltaic modules. After the project is put into operation, it is expected that the average annual power generation capacity will be 10.15 million kWh, and the total power generation capacity will be about 253.75 million kWh in 2025, which can provide sufficient clean electricity with good economic and social benefits, and help the Company realise energy conservation, emission reduction and low-carbon economic development.

            prev:Five achievements of MCC5 are evaluated as internationally advanced or domestically leading next:Xinjiang Lead-zinc Smelting Project is Ready for Material Commissioning